Case study · Tulsa, OK

Tulsa two-story brick home: new decking and a Class 4 roof

A steep two-story brick home in Tulsa got new decking and a Class 4 Vista AR roof with high-profile ridge caps. The crew worked tied off until past 8 PM.

After: The same view in October, under new Malarkey Vista AR shingles in Weathered Wood Plus
Before: Two-story brick home with a front dormer and a big arched window, under its old roof in July
Same view, July and October. Drag the handle, or tap Before or After.
  • 1 dayon the roof
  • Vista ARMalarkey shingles
  • Class 4impact rating
  • $26,245signed price

What we found

Steep upper roofs under big trees

The house sits under big trees, and its upper roofs are steep. That meant safety ropes for the crew and extra care around the lawn, beds and big windows below.

What we recommended

Two estimates side by side, and the owner chose Class 4

On July 21 Wayne sent a written estimate for a Class 3 impact-resistant roof. Three days later he sent a second one with Class 3 and Class 4 side by side.

At the end of July the homeowner signed for the Class 4 roof, Malarkey Vista AR in Weathered Wood Plus, with high-profile hip and ridge caps. A solar attic fan on the estimate was left off. On this house the Class 4 roof cost $2,289 more than the Class 3 roof.

The tricky part

Steep slopes and new decking

The roof came down to new decking, and the upper roofs are steep. The crew worked tied off with safety ropes and was still at it past 8 PM, by porch light.

Install day

From 7:55 AM to past 8 PM, by porch light

On roof day the crew tore off the old roof, put down new decking, covered it with Malarkey underlayment and shingled the house. Wayne's photos start at 7:55 AM, and the last one, at 8:03 PM, shows the crew finishing over the front porch by porch light.

Tarps covered the lawn and beds, and plywood stood over the big ground-floor windows to protect the glass while the old roof came off.

The result

Class 4 shingles and high-profile caps

The finished roof is Malarkey Vista AR in Weathered Wood Plus, with high-profile caps on the hips and ridges, finished on roof day. The house also has 292 feet of new painted gutters with 9 downspouts, which aren’t part of the signed price.

What you can take from this job

  • Rotten decking (the boards under the shingles) usually shows up at tear-off. A good crew photographs it, tells you and replaces the bad boards before the new roof goes on.
  • Seeing Class 3 and Class 4 prices side by side makes the choice easier, and Class 4 shingles may lower your insurance premium.
  • Ask how the crew will protect your lawn, beds and windows during tear-off; on this house it was tarps and plywood.

Photo story

The job in 13 photos

From the first visit to the finished roof, in the order they were taken. Tap a photo to see it bigger.

  1. Before July: the house before the new roof.
  2. Inspection The old shingles, vents and ridge before the new roof.
  3. Install day High-profile ridge caps and Vista AR shingles, ready on roof day.
  4. Tear-off Before 8 AM: tear-off under way, tarps down and plywood over the big windows.
  5. Decking By 8 AM the back of the roof was down to new decking.
  6. Decking Fresh decking, with chalk lines to keep the rows straight.
  7. Install day Crew tied off with safety ropes on the steep upper roof.
  8. Underlayment Malarkey underlayment over the new decking.
  9. Install day 9:39 AM: the front covered in underlayment, shingles next.
  10. Install day 7 PM: the last sections of shingles going on.
  11. Install day 8 PM: still at it, by porch light.
  12. Finished October: the finished front.
  13. Finished The back of the house with the new roof.

Want a roof like this one? The inspection is free.

Free roof inspection

Want a roof like this? Start with a free inspection.

Call, or book it online. We check the roof, show you the photos and give you a straight answer, even if that’s nothing.

Call 918-361-1786

… Austin absolutely answers the phone when you call

Monica W. · Jun 2026 · Google review
  1. We pick a time with you. Call us, or send the form and we’ll call you.
  2. We inspect the roof. We get on it and take photos of anything we find.
  3. You get a straight answer. Repair, replace or leave it alone, with photos of what we found.
  • Open 24 hours
  • Main office: 1938 U.S. Route 66, Claremore, OK 74019
  • Tulsa office: 5401 S Harvard Ave, Suite 111, Tulsa, OK 74135

Book your free roof inspection

Please add your name.

Please add your phone number.

Please add the street address.

Please add the ZIP.

What’s going on?

Pick the closest one.

A photo of the damage or the stain helps us get ready.

That photo is too big (10 MB at most). Pick a smaller one, or leave it out.

Texts from Von Eric Roofing, LLC (optional)

Free, no obligation. We’ll call you to pick a time.

Got it. Here’s what happens next.

  1. We call you back

    Austin or one of our team calls you to set a time for the free inspection. It often happens the same day; after a big storm, usually within 2 days.

  2. We inspect the roof

    We check the roof and take photos of anything we find.

  3. You get a straight answer

    Repair, replace or leave it alone, with photos of what we found. No pressure.

Leak now? Call 918-361-1786
Open 24 hours Call 918-361-1786Free inspection